What Happens After Demolition Is Complete?
The steps between a finished demolition and your builder starting, from waste removal to inspection and site preparation.
Demolition finishing is not the same as the site being ready. Here is what happens between the last bin leaving and your builder arriving.
Waste Removal and Clean-Up
All bins are collected, loose debris is swept and removed, and nails and sharp material are cleared from the slab and yard. The site should be handed over in a safe, broom-clean condition.
Site Inspection
Your builder and certifier inspect the slab, footings and levels, and confirm the site matches the approved plans. Any surprises are easier to solve at this stage.
Services
Confirm what needs reinstating, upgrading or relocating, and book the trades early. Utility lead times are a common cause of building delays.
Access and Protection
Fencing, signage and site protection are installed before construction starts, and neighbouring property is checked for any damage noted during demolition.
Documentation
Keep the demolition invoice, asbestos clearance and disposal records with your project files. They are useful for insurance and for resale.
We hand over a clean, safe site and tell you in writing exactly what has been completed.
Quick answers
What happens after demolition is finished?
Waste is removed, the site is cleaned and handed over, then services, slab and site levels are checked before your builder or certifier inspects and construction begins.