3 October 2026Costs & Budget

How to Budget for Unexpected Demolition Costs

How to size a demolition contingency, the surprises that actually happen, and when to pause rather than push on.

Every renovation has surprises. The difference between an inconvenience and a crisis is whether the money was already set aside.

Size the Contingency

Ten to fifteen percent of the demolition and strip-out cost is a reasonable baseline. Pre-1990 homes, or homes with previous unapproved renovations, warrant more.

The Surprises That Actually Happen

Asbestos found behind tiles, multiple flooring layers, termite damage, illegal previous work, blocked drains, and concrete where timber was expected.

Get Decisions Priced Before You Decide

When something is found, ask for the cost of removing it properly versus leaving it. A quick verbal estimate is fine, as long as it is followed by a written variation.

Do Not Cut Corners to Save Money

Skipping testing, reusing asbestos sheeting or skipping disposal does not save money, it moves the cost to remediation or a failed building inspection later.

Keep a Paper Trail

Every variation in writing, every invoice kept. It keeps the budget honest and helps at tax time if the property is an investment.

We flag anything unexpected as soon as we find it, with a price, before we touch it.

Quick answers

How much contingency should I allow for demolition?

Around ten to fifteen percent of the quoted price is a sensible starting point, and more for older homes where asbestos or hidden damage is likely.

Need a demolition quote?

Get a fixed price online in minutes — servicing every Brisbane suburb within 40km of the CBD.

We use minimal cookies to keep our site working and remember your preferences. See our Cookie Policy. You can accept or reject non-essential cookies.