Every renovation has surprises. The difference between an inconvenience and a crisis is whether the money was already set aside.
Size the Contingency
Ten to fifteen percent of the demolition and strip-out cost is a reasonable baseline. Pre-1990 homes, or homes with previous unapproved renovations, warrant more.
The Surprises That Actually Happen
Asbestos found behind tiles, multiple flooring layers, termite damage, illegal previous work, blocked drains, and concrete where timber was expected.
Get Decisions Priced Before You Decide
When something is found, ask for the cost of removing it properly versus leaving it. A quick verbal estimate is fine, as long as it is followed by a written variation.
Do Not Cut Corners to Save Money
Skipping testing, reusing asbestos sheeting or skipping disposal does not save money, it moves the cost to remediation or a failed building inspection later.
Keep a Paper Trail
Every variation in writing, every invoice kept. It keeps the budget honest and helps at tax time if the property is an investment.
We flag anything unexpected as soon as we find it, with a price, before we touch it.
Quick answers
How much contingency should I allow for demolition?
Around ten to fifteen percent of the quoted price is a sensible starting point, and more for older homes where asbestos or hidden damage is likely.